The main benefit of pre-engineered metal buildings is the shorter construction timeline. However, that doesn’t mean these types of projects are any less complex. It’s important to have a team that can manage the project and keep it on the timeline and under budget.
Wayne-Douglas works with manufacturers, engineers, and contractors to provide pre-engineered-metal building construction services and help bring buildings to life in the most efficient way possible.
Our pre-engineered building construction management services include:
Coordination Before Fabrication
While simpler than traditional construction in many ways, a pre-engineered building still isn’t something you simply order and drop onto a site. Before fabrication begins, the team needs to confirm the building’s dimensions, structural requirements, loading conditions, foundation requirements, access points, and how the building will be erected once the materials arrive.
If those details aren’t coordinated early, the project can run into problems after the steel has already been manufactured. Wayne-Douglas helps manage those early decisions so the building package, site work, and installation plan work well together before moving into the construction phase.
Capabilities
The Importance of Early Coordination
Coordination is one of the most important parts of any job involving pre-engineered metal building construction.
The coordination process typically involves matching the manufacturer’s building package to the foundation design, site preparation, and erection planning. For example, the foundation team needs accurate loads and anchor bolt requirements before concrete can be laid.
It’s equally important to plan for delivery access before trucks arrive with all the structural components.
While these details might seem small in the grand scheme of large projects like this, they’re the kinds of details that make for efficient pre-engineered building solutions.
FAQs
Most owners go this route to shorten the construction timeline or to build spaces that don’t require special exterior characteristics. That’s why these systems are commonly used for:
- Warehouses
- Distribution facilities
- Industrial buildings
- Commercial service facilities
- Institutional or utility structures
Not at all. There is still a wide range of building materials to work with, and all PEBs have a large, open interior that’s completely configurable to the requirements of the space.
The most important decisions typically include:
- Building dimensions
- Structural loads
- Door openings
- Foundation requirements
- Insulation needs
- Site access
All of these should be worked through before fabrication begins. Once components are manufactured, it becomes a lot more difficult and a lot more expensive to make changes.
That’s why Wayne-Douglas helps organize those decisions before the project reaches that point.
Wayne-Douglas coordinates with all crews involved. That’s one of the main reasons owners bring our team in. The manufacturer provides the building system, the engineer handles structural requirements, and the erection crew installs the components on-site.
Every team needs to have the same information at the right time.
It depends entirely on the project, but typically we see issues with late design changes, foundation details that don’t match the building package, permitting issues, missed delivery windows, or poorly planned erection sequences.
Pre-engineered metal building construction can move at an incredible pace, but only when fabrication, site work, and installation are coordinated well in advance.
Need a team to manage your next pre-engineered metal building construction project?
Call Wayne-Douglas. We can walk you through manufacturer selection, site requirements, and how to structure the schedule.